
Monday, March 12, 2007
35) Deck Install
I installed the decks according to the instructions in Canoecraft (using epoxy and brass screws). I drew the pleasing curve you see on the bottom of the deck with the help of an empty flower pot in Matt's driveway. I then used Elie's new Bosch jigsaw to cut the curve. On a side note, I am now a Bosch convert, this jigsaw was smoother than any other I have ever used. The cut was so nice, I did not even sand the cut before I installed the decks... Awesome. Finally, I used thickened epoxy to fill any gaps.

Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment